Buried Asset System Inspection Condition Assessment Rehabilitation**
TRA Central Regional Wastewater System
The project consisted of an approximately 3,500 linear feet (LF) of point repair, replacement, cleaning and inspection, and/or rehabilitation of existing storm and in-plant drain pipelines ranging from 6-inch to 60-inch in diameter. Also included is 1,500 LF of piping, valves, appurtenances, and flow meter necessary to provide conveyance from Pump Station 22 to beginning of liquids treatment processes, existing in-plant drain system, and existing wet well.
**Project listed is representative of Kenall Geo staff’s diversified experience from previous professional engagements. Kenall Geo staff acted as the Geotechnical Project Manager and/or Geotechnical Engineer-of-Record (EOR) on the project while they were with their previous employer.